|
Product Details:
Payment & Shipping Terms:
|
| Material: | Stainless Steel SUS304 | Machine Name: | Carbonated Beverage Filling Machine |
|---|---|---|---|
| Function: | Rinse Fill Cap | Filling Material: | Carbonated Drink, Soda Water, Sparkling Water |
| Capacity: | 6000-8000BPH | Warranty: | One Year |
| Highlight: | soda bottling machine,carbonated beverage filler |
||
250-2000ML PET Bottle Soft Drink Bottling Plant , Monoblock Filler And Capper
THE WASHING PART
There is no need to adjust the height of machine through neck holding tech for bottle
transportation.
![]()
THE FILLING PART
The advanced technology from Germany and Italy are employed ,so the speed of filling is fast and the liquid amount is controlled accurately.
![]()
THE PACKAGING PART
It can be stopped automatically when there is no bottle or bottles are damaged.
![]()
| Model: | CGF24-24-8 |
| Capacity: 500ml | 5000-7000 |
| Bottle shape: | Roud or square |
| PET bottle: (mm) | (Bottle Diameter): φ50-φ110mm (Height): 150-340mm |
| cap: | PE srew cap |
| filling precision: | ≤ ± 5mm |
| filling pressure: (Mpa) | 0.15-0.35 |
| rinsing pressure: (Mpa) | 0.2-0.25 |
| filling volume: (L) | 8 |
| overall size: (mm) | 3800*2950*2400 |
| weight: (kg) | 6500 |
Q:If we wanna consult your machines,what information we should supply for you ?
A: Pls inform us the filling capacity(how many bottles per hour),bottle size you use (300ml-2000ml pet bottle),filling mineral water or pure water? Need a full line or just filling machine?
Q:How many machines included in full line ?
A: The complete line includes: Water Treatment System- Automatci PET Bottle blowing machine- Automatic 3 in 1 water filling machine - Lamp inspection - bottle dryer - Automatic PVC shrink labeling machine - Automatic ink jet printer - Automatic PE Film Shrink wrapping Machine or Carton Packing Machine - Storage Room.
Q:If we juat wanna open a small scale for start,what capaity do you recommend?
A: If you're new for this business, we suggest you choose 2000BPH/3000-4000BPH for start.
Q:What else information we should supply for you
A: Factory layout -- We should make machine layout as your factory layout, how to put machine and save space. Whether need extra buffer conveyor for line.
Bottle sample/caps -- After you placed an order,we will machine machines as your bottle sample and caps.
Q:What's the manufacture time commonly ?
A: Commonly the full line manufacture time below 8000bph is 35-40 working days after receive bottle sample
If with blowing machine the manfacture time will be 45-50 working days over 8000bph.
Contact Person: Mr. Zhu
Tel: 86-13962283938
Fax: 86-512-58666892